What was found
MAIN CABIN BETWEEN FS 160-200, LBL44 FLOOR SUPPORT HAS CORROSION. CPC TASK NR46-53303 REMOVED CORROSION MATERIAL LOSS UP TO .021. ORGINAL MATERIAL .063 FOUND TO BE OUT OF LIMITS IAW SRM 53-01. REMOVED AND FABRICATED NEW PART MAIN CABIN BETWEEN FS 160-200, LBL44 FLOOR SUPPORT IAW SRM 51-10-2, 51-13-11, FIG 11 INSTALLED FLOOR SUPPORT AND GALLEY MOUNT IAW 51-30-5.