What was found
DURING M-CHECK FOUND RT NLG W/W TUNNEL, STA 365, LBL 24 TO RBL 24, FLOORBEAM HAS CORROSION. FABRICATED REPLACEMENT CHORD, 02 EA REPAIR ANGLES, AND 02 EA REPAIR STRAPS, TO FLOORBEAM 70 IAW SRM 53-00-51, REPAIR 3, PAGE 203, FIG 201. TREATED AND PRIMED REPLACEMENT CHORD, 02 EA ANGLES, AND 02 EA STRAPS, TO FLOORBEAM REPAIR IAW SRM 53-00-51, PAGE 201, FIG 201, AND REPAIR 3. INSTALLED REPLACEMENT CHORD, 02 EA ANGLES, AND 02 EA STRAPS ON FLOORBEAM IAW SRM 53-00-51, PAGE 201, FIG 201, REPAIR 3. REINSTALLED PARTS (DOUBLER AND FILLER) ON STA 365.5, RBL 45, IN REF TO SRM 51-40-02, PAGE 4 PARAGRAPH 7.