As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
LT WING FLAP, FLAP HALF OF NR 2 HINGE HAS NDT VERIFIED CRACK. REMOVED & REPLACED LT FLAP NR 2 FLAP HINGE AFT HALF IAW DC-9 OHM 27-50-1 PERFORMED OPS CHECK; OPS CHECK GOOD IAWDC-9 AMM 27-57-02 REMOVED & REINSTALLED BUSHINGS IN NR 2 FLAP HINGE IAW DWG 5912150 & BOEING SPM 20-10-7 ON 2448N00409.