Service difficulty report · Floor Support · Doug DC951

Difficulty date
February 9, 2011
Submitted
February 10, 2011
Operation
Air carrier
Aircraft
N782NC
Make and model
Doug DC951
Aircraft serial
48107
Aircraft time
70,709 hours, 65,469 cycles
Part
Floor Support
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

MAIN CABIN STA 200, LBL 1 TO 20 FLOOR SUPPORT HAS CORROSION. REMOVED CORROSION ORIGINAL MAT .060 REMOVED .048, REMAINING .012 FOUND TO BE OUT OF LIMITS. REMOVED FLOOR SUPPORT TRIMMED, LOCATED , DRILLED, TREATED, PRIMED, SEALED AND INSTALLED NEW FLOOR SUPPORT ALL WORK ACCOMPLISHED IAW SRM'S 53-13-1, FIG 11, 51-10-1, FIG 53-01, FIG 1, 51-10-2, 51-10-4, 51-10-3, 51-20-00, 51-30-5.

More about the Doug DC-9-51