What was found
UPON FURTHER OPEN UP FOUND INTERNAL DOUBLER AT STAIR CONTROL CUT OUT CRACKED. ORIG MAT .032 2014-T6 IAW DC-9 SRM 53-33-0 FIG 5. REMOVED AND REPLACED INTERNAL DOUBLER MAT .032 7075-T6IAW DC9 SRM 53-30-2 & 51-30-5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
UPON FURTHER OPEN UP FOUND INTERNAL DOUBLER AT STAIR CONTROL CUT OUT CRACKED. ORIG MAT .032 2014-T6 IAW DC-9 SRM 53-33-0 FIG 5. REMOVED AND REPLACED INTERNAL DOUBLER MAT .032 7075-T6IAW DC9 SRM 53-30-2 & 51-30-5.