What was found
MAIN CABIN OVERWING STA 775 BETWEEN BL-0 AND LBL-22 FLOOR SUPPORT CRACKED. REMOVED CRACKED FLOOR SUPPORT. RCVD MAT .0502024-T3 PO 1130701. FABRICATED, LOCATED, DRILLED, DEBURRED, TREATED, PRIMED, SEALED, INSTALLED NEW FLOOR SUPPORT. ALL WORK ACCOMPLISHED IAW DC9 SRM 51-10-2, 51-10-3, 51-10-4, 51-30-2, 53-13-3 FIG 11, 51-20-00.