What was found
RT WING INBD FLAP L/E PUNCTURED REMOVED DAMAGED SKIN AND CORE, FABRICATED INNER SKIN AND BONDED, FABRICATED CORE AND BONDED, FABRICATED REPAIR PLIES AND BONDED, SANDED SMOOTH TO CONTOUR, SEALED EXPOSED FIBERS, CLEANED AREA, APPLIED PRIMER AND PAINT, WORK PERFORMED IAW SRM 57-52-00 PARA 8 A FIG 201. REQUIRED INSPECTION COMPLETED BY SAN NR 489916.