What was found
DURING PSV VISIT IN MSP 6 DAMAGED HOLES WERE FOUND ON THE RT SIDE OF THE VERTICAL STAB FRONT SPAR CHORD. THE SUBJECT HOLES WERE OPENED TO NR 1-(0.218") NR 4-(0.218") NR 5-(0.218") NR -6(0.218") NR 7-(0.234") RESPECTIVELY. THE HOLES ARE OPENED IN THE SPAR CHORD TO ALLOW FOR 0.030 WALL MIN. ON EA. BUSHING. BUSHINGS ARE INSTALLED AT EACH LOCATION AND A REPAIR STRAP WAS INSTALLED PER DRAFT SG0955005-7003 REPAIR. DURING THE REPAIR THE FORTH HOLE BELOW NR 1 WAS DAMAGED AND REQUIRED OVERRSIZE TO .246 TO OBTAIN CLEAN HOLE. NOTE THAT ALL HOLES WERE OUT OF ROUND AND NO CRACKS WERE FOUND DURING INITIAL INSP ERA-494480-14.