What was found
PER ER/A 494421-14AD, FOLLOW-UP ACTIONS ARE REQ PER SECT II AND SECTION III, TO INSP AND MODIFY THE 80VU AVIONICS RACK SUPPORT FITTINGS. SECTION I HAS BEEN ACCOMPLISHED AT CURRENT M-CK AUG 2011. ACCOMP SECT II INSP EVERY 750 FC AFTER 31AUG11, UNTIL SECT III IS ACCOMP. SECT III IS REQ WITHIN 4500 FC. SECTION II AND III SHOULD ONLY BE PLANNED IN MSP, ATL OR BFM. WORK ACCOMP ON CARD #5311-01186 SECT 03A AND 03B, ACCOMP ER/A 494421-14AD SECT III PERM REPAIR.