Service difficulty report · Crease Beam · Boeing 757251

Difficulty date
December 12, 2011
Submitted
December 14, 2011
Operation
Air carrier
Aircraft
N533US
Make and model
Boeing 757251
Aircraft serial
24264
Aircraft time
2,561 hours, 1,473 cycles
Part
Crease Beam
Condition
Damaged
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CREASE BEAM REPAIR. CURRENT ER/A REVISION IS 'A'. SECTION II INSP REQUIREMENT HAS BEEN ADDED. ACCOMPLISH SECTION II NO LATER THAN 36200 TOTAL A/C FLIGHT CYCLES. THE SECTION II INSPECTION IS PENDING A STAGE III DAMAGE TOLERANCE ANALYSIS. CONTACT ENGINEERING WHEN THE A/C REACH 33200 TOTAL FLIGHT CYCLES, SUCH THAT A STAGE III DAMAGE TOLERANCE ANALYSIS CAN BE INITIATED. ASSOCIATED ER/A 13-487261 ADDED FOR AC 5533.