What was found
DURING INSPECTION FOUND CABIN UPPER LOBE TENSION TIES AREA BS 1200. FOUND SHEAR TIE NEAR STRINGER CUTOUT CRACKED. MAINTENANCE FABRICATED NEW SHEAR TIE AS PER DWG 65B01735. CRACKED SHEAR TIE REMOVED AND NEW FABRICATED SHEAR TIE INSTALLED AS PER SRM 51-40-02. HEAT TREAT CARRIED OUT AS PER 5602 REV AF. HARDNESS TESTED AVERAGED HRB 88.7 AS PER 5946 REV AA. CONDUCTIVITY TEST CARRIED OUT FOUND VALUE 32 .5 PERCENT IACS WITHIN LIMIT AS PER 5651 REV B.