What was found
RIGHT WING TOP SKIN PANEL NR 2, OVERWING REFUEL HOLE, BETWEEN RIBS 19 AND 20 REQUIRES FOLLOW-ON INSPECTION. REPAIR WAS ACCOMPLISHED ON N/R 640/6 DURING M CHECK AT BFM AUG 2012.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT WING TOP SKIN PANEL NR 2, OVERWING REFUEL HOLE, BETWEEN RIBS 19 AND 20 REQUIRES FOLLOW-ON INSPECTION. REPAIR WAS ACCOMPLISHED ON N/R 640/6 DURING M CHECK AT BFM AUG 2012.