What was found
RIGHT WING, OTBD FLAP VANE NR 5, HAS SOME DEEP GOUGING ON THE UPPER SURFACE. REPAIRED RT WING OTBD NR 5 FLAP VANE BY REMOVING DAMAGE SKIN, FABRICATED FILLER AND DOUBLER, AND BONDED FILLER AND DOUBLER AT 225 DEGREES-240 DEGREES FOR 90 MINUTES IAW SRM 51-70-2D, PAR 18 AND ER/A 497176-14MA, REV ORIGINAL. ASSOCIATED ER/A 14-497176 ADDED FOR AC 0936.