What was found
CORROSION ON FLOORBEAM BS 345, BL-0 TO RBL 60. COMPLETED STEPS 1 & 2 PER SRM 53-00-51 REPAIR 3. BEGAN FABRICATION OF NEW FLOORBEAM PER SRM 53-00-51 FIG 201. COMPLETED STEPS 3 THRU 6 PER SRM 53-00-51 REPAIR 3. TREATED AND PAINTED PER SRM 53-00-51 REPAIR 3 STEPS 7 & 8. BEGAN INSTALLATION PER SRM 53-00-51 REPAIR 3. REPAIRED PER SRM 53-00-51.