Service difficulty report · Floor Support · Boeing 7572Q8

Difficulty date
April 22, 2012
Submitted
April 25, 2012
Operation
Air carrier
Aircraft
N624AG
Make and model
Boeing 7572Q8
Aircraft serial
25624
Aircraft time
46,573 hours, 17,222 cycles
Part
Floor Support
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CHANNEL- CORROSION LOCATION: FLOOR SUPPORT CHANNEL LOCATED FROM STA 1500-1640 RBL 12.25 POS: AFT REMOVED FLOOR SUPPORT CHANNEL BEGAN DRILLING HOLES ON FLOOR SUPPORT CHANNEL. OK TO INSTALL FLOOR SUPPORT FINISH INSTALLATION OF FLOOR SUPPORT CHANNEL PER BAC DWG 146N5390.

More about the Boeing 757-2Q8