As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
AIRCRAFT FAILED STEP 7 OF THE TAILCONE RELEASE SYSTEM OPERATIONAL CHECK. THE RELEASE MECHANISM CAM EXCEEDED THE ALLOWABLE TORQUE LIMIT. THE SYSTEM WAS CLEANED, LUBRICATED, AND THE SPRING TENSION ADJUSTED PER MANUAL. THE RII STEPS WERE COMPLETED AND SIGNED OFF.