What was found
DURING OPEN HOLE HFEC INSPECTION ON LT SIDE BS 1140 TENSION TIE, FOUND ONE CRACK AT FWD CHANNEL, UPPER ROW FIRST FASTENER HOLE FROM OTBD. TENSION TIE FWD CHANNEL R & R AND ESTABLISHED MONITORING IAW SRM 53-40-30 REPAIR 2 PAGE 214 .
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OPEN HOLE HFEC INSPECTION ON LT SIDE BS 1140 TENSION TIE, FOUND ONE CRACK AT FWD CHANNEL, UPPER ROW FIRST FASTENER HOLE FROM OTBD. TENSION TIE FWD CHANNEL R & R AND ESTABLISHED MONITORING IAW SRM 53-40-30 REPAIR 2 PAGE 214 .