What was found
DURING INSPECTION, FOUND SHEAR TIE DAMAGE. MX TRIMMED LOCATED AND DRILLED NEW SHEAR TIE AS REQUIRED. INSTALLED NEW SHEAR TIE IAW SRM 51-40-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING INSPECTION, FOUND SHEAR TIE DAMAGE. MX TRIMMED LOCATED AND DRILLED NEW SHEAR TIE AS REQUIRED. INSTALLED NEW SHEAR TIE IAW SRM 51-40-02.