What was found
STEP ON SPLICE REPAIR AT TEE CAP OF PRESSURE DOME, BS 1338 BETWEEN PROJECTION LONGS 26-27L AFT CARGO BAY. SHIMS WERE FABRICATED, TREATED, PAINTED, INSTALLED IAW SRM 53-03D, FIG 37A,.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
STEP ON SPLICE REPAIR AT TEE CAP OF PRESSURE DOME, BS 1338 BETWEEN PROJECTION LONGS 26-27L AFT CARGO BAY. SHIMS WERE FABRICATED, TREATED, PAINTED, INSTALLED IAW SRM 53-03D, FIG 37A,.