Service difficulty report · Shear Tie · Doug MD88

Difficulty date
April 22, 2014
Submitted
April 25, 2014
Operation
Air carrier
Aircraft
N960DL
Make and model
Doug MD88
Aircraft serial
49979
Aircraft time
62,941 hours, 46,952 cycles
Part
Shear Tie
Condition
Cracked
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CRACK ON SHEAR TIE BETWEEN STRINGERS 1 AND 2R, ORIGINATING FROM FIRST FASTENER, FROM INBD CLOSE TO VERTICAL STABILIZER DORSAL FIN ATTACH FITTING. REMOVED SHEAR TIE, FABRICATED NEW SHEAR TIE, TREATED AND PRIMED SHEAR TIE AND INSTALLED IAW SRM 51-30-5, 51-10-3, DWG 9911860, REV L, FAS ENGINE REPORT NR 2-37153-801A, REV A.

More about the Doug MD-88