What was found
DURING INSPECTION, FOUND CRACK ON SUPPORT ANGLE ON LT FORWARD PYLON INBD SIDE BETWEEN RIB 5-RIB 6 CANTILEVER STRUCTURE. PERFORMED PERMANENT REPAIR ON SUPPORT ANGLE ON LT FORWARD PYLON INBD SIDE BETWEEN RIB 5 TO RIB 6 CANTILEVER STRUCTURE IAW SRM 54-52-12, PARA 5N FIG 214, SHEET 2.