What was found
CRACK ON AFT BULKHEAD OF STAIRWAY WALKING BRIDGE. BULKHEAD WAS REMOVED IAW SRM 51-30-2 AND 51-30-4, FABRICATED IAW SRM 53-14-3, TREATED AND PAINTED IAW SRM 51-10-3, PAR 14 AND 21, NEW BULKHEAD INSTALLED IAW SRM 53-01, FIG 2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CRACK ON AFT BULKHEAD OF STAIRWAY WALKING BRIDGE. BULKHEAD WAS REMOVED IAW SRM 51-30-2 AND 51-30-4, FABRICATED IAW SRM 53-14-3, TREATED AND PAINTED IAW SRM 51-10-3, PAR 14 AND 21, NEW BULKHEAD INSTALLED IAW SRM 53-01, FIG 2.