What was found
CRACKED ANGLE ON BEAM 4 AFT END AT R1 DOOR STRUCTURE. ANGLE WAS REMOVED IAW SRM 51-30-2, AND FABRICATED IAW DWM 9911579, REV L. NEW ANGLE WAS TREATED AND PAINTED IAW SRM 51-10-3, PAR 14 AND 21, AND INSTALLED IAW SRM 51-30-2.