What was found
DURING HMV4, A SID INSPECTION FOUND A TWO INCH CRACK AT BS 1418 BETWEEN L1 AND L2R. THE CRACK WAS REPAIRED. SID AD 2004-11-07 APPLIES. ACCOMPLISH ER/A 88-516239-14 SECTION II DTA REQUIREMENT WITHIN 18 MONTHS OF SECTION I ACCOMPLISHMENT. ASSOCIATED ER/A 88-516239 ADDED FOR AC 0951. REDEFERRED LOG TO QC, ESTAB MONITOR INSPECTION 10-0553-8-7230, SN 0951. ER/A 516239-14AD, REV A, THIS LP IS TERMINATED, DTA HAS BEEN ACCOMPLISHED, NEW INSPECTIONS ARE BEING TRACKED ON LP 1784131. CLOSED LOG AND REMOVED MON INSP IAW ALERT 15JAN15 AND LOG COMMENTS.