What was found
CORROSION ON INBD, MID, OTBD RIB HOLES AT RT SLAT PANEL NR 3. CORROSION WAS REMOVED AND FABRICATED BUSHINGS. INSTALLED NEW BUSHINGS IAW SRM 57-02, PAR 9.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION ON INBD, MID, OTBD RIB HOLES AT RT SLAT PANEL NR 3. CORROSION WAS REMOVED AND FABRICATED BUSHINGS. INSTALLED NEW BUSHINGS IAW SRM 57-02, PAR 9.