What was found
SCRATCHES ON BUSHING OF HINGE ATTACH POINTS NR 2, 3, AND 4 AT LT ELEVATOR. VHS, AYP. BUSHING OF HINGE ATTACH POINTS NR 2, 3, AND 4 AT LT ELEVATOR WERE REMOVED IAW CMM 27-30-1, NEW BUSHING OF HINGE ATTACH POINTS 2 AND 4 WERE INSTALLED IAW CMM 27-30-1. BORE HINGE 3 WAS FOUND OUT OF LIMITS AND A NEW BUSHINGS IN BORE HINGE 3 WILL BE ATTENDED UNDERCARD 38 AC ZONE 30, RII COMPLETED BY INSPECTION.