What was found
CRACKED INNER PAN BETWEEN BEAM NR 5 AND FWD CARGO EDGE AT MID CARGO COMPARTMENT DOOR, C2, SM. CRACKED INNER PAN WAS STOPPED IAW SRM 51-01, PAR 21. CRACKED LONGERON .755", NEW DOUBLER WAS FABRICATED IAW SRM 52-03D NEW DOUBLER WAS PAINTED AND INSTALLED IAW SRM 51-10-3, PAR 14 AND 21, 51-30-2 AND 51-30-4.