What was found
CRACKED FWD EDGE PAN WITH BEAM 5 OF MID CARGO DOOR. CRACKS WERE FOUND STOPPED IAW SRM 51-01, 21, A AND STEPS 1, 2 HFEC INSPECTION WAS ACCOMPLISHED AROUND STOP DRILLS NO MORE CRACKS WERE FOUND IAW SRM 51-01, PAR 21, B NEW DOUBLER WAS FABRICATED PAINTED AND INSTALLED IAW SRM 52-03D, FIG 8 AND 51-10-3, PAR 14.