What was found
CORROSION ON VENTRAL STAIRWAY STEPS 1, 3, 4, 5, AND 6 SETTLEMENT AREA. STEPS 5, AND 6 WERE DRILLED AND ADJUSTED IAW SRM 52-60-0, CORROSION WAS REMOVED ON VENTRAL STAIRWAY STEPS 1, 3, & 4.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION ON VENTRAL STAIRWAY STEPS 1, 3, 4, 5, AND 6 SETTLEMENT AREA. STEPS 5, AND 6 WERE DRILLED AND ADJUSTED IAW SRM 52-60-0, CORROSION WAS REMOVED ON VENTRAL STAIRWAY STEPS 1, 3, & 4.