What was found
CORROSION ON FLOOR SUPPORT BETWEEN BS 160 - 200 LBL 54. FLOOR SUPPORT STA Y=160-169 X=44 WAS REMOVED; DRILLED; ADJUSTED; TREATED AND PAINTED; AND INSTALLED PER DC9/MD80 SRM 51-30-2; 51-30-5; 51-10-4; 51-10-3 PAR 14 AND 21/FLOOR SUPPORT STA Y=186-195 X=44 CORROSION WAS REMOVED, TREATED AND PAINTED PER DC9/MD80 SRM 51-10-3 PAR 26, 21 AND 14; MEASURE WAS ACCOMPLISHED WITH NDT SPM 04-00-07 PAR 5 FIG 3 SHEET 1 AND 2 ORIGINAL THICKNESS .063" REMAINING THICKNESS .061" ON FLOOR SUPPORT (1 EA) THEREFORE ITS WITHIN LIMITS IAW SRM 53-01 FIG 1 (SHEET 3). CIC WAS APPLIED IAW SRM 51-10-3 PAR 38.