What was found
ON TAKEOFF ROLL CENTER FUEL PRESS LO LIGHT ILLUMINATED. CB J21 AND J23 WERE FOUND POPPED ON CLIMBOUT. T/S PER MM REF 28-20-07-101 THRU STEP 4 - WIRING CK AT TERMINAL STRIP S3-10 CKS OK. REF WDM 28-21-00 RANG LT AND RT BOOST PUMPS PHASES A B C TO GRD AND PHASE TO PHASE. ALL CKD GOOD. RANG CENTER BOOST PUMPS FROM TERMINAL BLOCK 53-10 TO PUMP. CKS GOOD. REPLACED TERMINAL BLOCK B7-8. ALL OPS CKD GOOD. REPLACED CENTER TANK AFT BOOST PUMP PER AMM 28-20-07 PB201. REPLACED LT WING FWD BOOST PUMP PER AMM 28-20-07. PERFORMED OPERATIONAL CKS AND COMPLIED WITH SFAR 88 - CDDCL REQUIREMENTS PER MD88 AMM 28-20 AND 28-00-00 PB201. ALL CBS RESET- LEAK CKS COMPLETED.