Service difficulty report · Relay · Doug MD9030

Difficulty date
April 1, 2018
Submitted
April 3, 2018
Operation
Air carrier
Aircraft
N960DN
Make and model
Doug MD9030
Aircraft serial
53530
Aircraft time
52,910 hours, 27,907 cycles
Part
Relay
Condition
Failed
Location
Power Transfer
Stage of operation
TO
How discovered
O
Nature of condition
J
Precautionary procedure
C

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING TAKE OFF, ENGAGED AUTO-THROTTLES AT 70 KNOTS. DC BUSS OFF MESSAGE APPEARED ON THE EPCU ANNUNCIATOR PANEL. ALL OTHER SYSTEMS & INDICATIONS NORMAL BEFORE AND AFTER ATO. PERFORMED NO GO ODI PREVENTION CHECK LIST. FOUND DC EMERGENCY POWER TRANSFER RELAY R2-326 FAILED. REPLACED THE RELAY. OPS CHECKED NORMAL.

More about the Doug MD-90-30