What was found
INITIAL INSPECTION, CORROSION ON SUPPORT STA 1681 RBL 52, AT AFT GALLEY FLOOR STRUCTURE. LEVEL CORROSION 2. SUPPORT WAS REPLACED PER SRM 51-40-02 PAR 4E, SRM 51-40-05, SRM 51-20-01 PAR 4 AND 2 AND PS 900-2 NR 09.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INITIAL INSPECTION, CORROSION ON SUPPORT STA 1681 RBL 52, AT AFT GALLEY FLOOR STRUCTURE. LEVEL CORROSION 2. SUPPORT WAS REPLACED PER SRM 51-40-02 PAR 4E, SRM 51-40-05, SRM 51-20-01 PAR 4 AND 2 AND PS 900-2 NR 09.