Service difficulty report · Warning Message · Bombdr BD1001A10

Difficulty date
June 15, 2019
Submitted
June 17, 2019
Operation
Air carrier
Aircraft
N113DQ
Make and model
Bombdr BD1001A10
Aircraft serial
50032
Aircraft time
205 hours, 94 cycles
Engine
Pwa PW1519G
Part
Warning Message
Condition
Illuminated
Stage of operation
AP
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING APPROACH INTO LGA, OBSERVED A "FMS OEI PERF ACTIVE" MASTER CAUTION MESSAGE , THEN OBSERVED LEFT ENGINE N1 ROLLING BACK AND EGT DECREASING. ABOUT 1 MIN LATER ENGINE RECOVERED TO NORMAL, LEFT GEN NEVER FELL OUT AND ALL OTHER IND NORMAL (0223/ JFK). REF LOG # 112237, PERFORMED POWER ASSURANCE TEST AND POWER ACCELERATION AND DECELERATION PER AMP BD500-1-J71-00-00-01AAA- 320A-A AND BD500-A-J71-00-00-01AAA-320B-A, ALL PARAMETERS NML. PER A220 EFIM SOLUTION NUMBERS 1-10333 AND 1-10334, CHECKED FOR ANY MOISTURE OR BLOCKAGE IN THE P2/T2 CONNECTIONS AND EEC CONECTIONS BLEW COMPRESSED AIR INTO LINES TO ENSURE THEY WERE CLEAR, RAN EEC SYSTEM TEST , NO FAULTS, ALSO RAN A/T OPERATIONAL TEST PER BD500 AMP TASK BD500-A-J71-00-00-01AAA- 320B-A, RAN AT IDLE FOR 15 MINUTES, THEN 5 MINUTES AT 79% N1, THEN ALLOWED 15 MIN TO COOL, ALL PARAMETERS NML THEN RAN POWER ACC AND DECELERAION TEST PER AMP BD500-A-J71-00-00-01AAA-320A-A, BOOSTED TO MAX T.O FOR 30 SECS, PARAMETERS NORMAL, THEN ALLOWED ENG TO WARM TO TARGET N1 FOR 15 MINS, BOOSTED N1 TO MAX-TOOK 6.4 SEC, THEN BACK TO IDLE TOOK 7.9 SECS, ENG PARAMETERS WITHIN LIMITS (957782). C/W ERA 579025-14 REV ORIG PERMANENT REPAIR INSTRUCTIONS STEP 1-9, ACCOMPLISHED NO 2 ENGINE POWER ASSURANCE TEST PER AMP TASK BD500-A-J71-00-00-01AAA-320B-A AND NO 2 ENGINE POWER ACCELERATION AND DECELERATION TEST PER AMP BD500-A-J71- 00-00-01AAA-321A-A. ALL PARAMETERS NORMAL, NO ABNORMALITIES NOTED, OKAY FOR SVC. (LP#5120993)