What was found
CORROSION STA 287 FLOOR BEAM RBL 75 (APPROX.) UPPER SURFACE. REMOVED, LOCATED, DRILLED, DEBURD AND INSTALL NEW T-CAP AT STA 287 RBL75, ALODINE, PRIMED AND TOP COAT IAW B767-300 SRM 53-00- 51 FIG 201 REPAIR 1, SRM 51-40-02 AND SRM 51-20-01 JOB COMPLETE. (LP1305675)