What was found
PD:DURING THE ACCOMPLISHMENT OF CMM 310T1020-3 ATA 71-21-11, REPAIR 3-2,ONE OF THE BEARING BORES WAS MACHINED TO THE MAXIMUM OVERSIZE &CORROSIO CA:AFTER REMOVAL OF THE CORROSION FINAL MEASUREMENTS WERE SENT TO BOEING.BOEING APPROVED OF THE DIMENSIONS AND PROVIDED INSTRUCTIONS FOR ASLEEVE REPAIR TO ALLOW FOR BEARING INSTALLATION. ER/A 582264-14 WASCREATED FOR THE REWORK AND A FAA FORM 8100-9 WAS ISSUED.