Service difficulty report · Pressure Panel · Airbus A320212

Difficulty date
February 10, 2020
Submitted
February 14, 2020
Operation
Air carrier
Aircraft
N338NW
Make and model
Airbus A320212
Aircraft serial
360
Aircraft time
83,203 hours, 36,980 cycles
Part
Pressure Panel
Condition
Cracked
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LEFT HAND PRESSURE FLOOR PANEL; CRACKS FOUND AT HOLE A AND B, REPAIR IN ACCORDANCE WITH WORK CARD 5311-01171-04A PRIOR TO FURTHER FLIGHT. AA 5311-01171; SB A320-53-1264; AD-2018-06- 04

More about the Airbus A320-212