Service difficulty report · Shutoff Valve · Bombdr BD1001A10

Difficulty date
March 11, 2020
Submitted
March 13, 2020
Operation
Air carrier
Aircraft
N103DU
Make and model
Bombdr BD1001A10
Aircraft serial
50022
Aircraft time
3,393 hours, 1,626 cycles
Engine time
3,379 hours, 1,621 cycles
Part
Shutoff Valve
Condition
Malfunctioned
Location
Bleed Air Sys
Stage of operation
IN
How discovered
O
Nature of condition
B, J
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ON TAXI IN F/A REPORTED ADD RUBBER BURN SMELL. SHORTLY AFTER RECEIVED A RT BLEED AIR FAIL MESSAGE. COMPLIED WITH CHECKLIST. SMELL WENT AWAY. C/W ODI PREVENTION PROGRAM ATA 2172. C/W W/C 0550-2001 TO STEP 8 (378779). C/W E-FIM ELIMINATION OF RESIDUAL ODORS FOR APU SOLUTION # 1-8458. C/W E-FIM SOLUTION ID 1-8449 LEFT ENG SOURCE. NO SMOKE OR ODORS PRESENT. C/W E-FIM SOLUTION ID 1-8451 RIGHT ENG SOURCE. NO SMOKE OR ODORS PRESENT (362813). R/R #2 ENG PRSOV PER A220-100 AMP 36-11. NO LEAKS NOTED. OPS TEST NORMAL PER A220-100 AMP 71-00-00-00AAA-364A-A. (LP# 7014712)