What was found
CORROSION HINGE FITTING LUG NR 2 ELEVATOR ON RT HORIZONTAL STABILIZER. CORRECTIVE ACTION: REPLACED BUSHINGS (2EA) OF HINGE FITTING NR 2 ELEVATOR RT HORIZONTAL STABILIZER, AS PER AIRBUS CMM 55-21-15.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION HINGE FITTING LUG NR 2 ELEVATOR ON RT HORIZONTAL STABILIZER. CORRECTIVE ACTION: REPLACED BUSHINGS (2EA) OF HINGE FITTING NR 2 ELEVATOR RT HORIZONTAL STABILIZER, AS PER AIRBUS CMM 55-21-15.