Service difficulty report · Fitting · Airbus A319114

Difficulty date
December 14, 2020
Submitted
December 15, 2020
Operation
Air carrier
Aircraft
N346NB
Make and model
Airbus A319114
Aircraft serial
1796
Aircraft time
49,164 hours, 25,406 cycles
Part
Fitting
Condition
Damaged
Location
Sense Line
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ATB-DUE TO ENGINE 2 BLEED PRESSURE ABNORMAL ECAM MESSAGE. CORRECTIVE ACTION: T/S FOUND TRANSFER PRESS SENSE LINE FITTING DAMAGED AND REPLACED UNION. REPLACED SENSE LINE AND REPLACED TRANSDUCER PRESS BLEED, PER A319 AIPC 36-11. C/W PNEUMATIC SYSTEM HEALTH CHECK, NO FAULTS NOTED.

More about the Airbus A319-114