What was found
DURING TEST PSU OXY PANEL AT 27 DEF DID NOT OPEN. CORRECTIVE ACTION: REPACKED PSU. OPERATIONS CHECK OK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING TEST PSU OXY PANEL AT 27 DEF DID NOT OPEN. CORRECTIVE ACTION: REPACKED PSU. OPERATIONS CHECK OK.