Service difficulty report · Panel · Airbus A320212

Difficulty date
December 23, 2020
Submitted
January 8, 2021
Operation
Air carrier
Aircraft
N345NW
Make and model
Airbus A320212
Aircraft serial
399
Aircraft time
82,798 hours, 37,651 cycles
Part
Panel
Condition
Cracked
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CRACK WAS FOUND AT THE FASTENER OF THE UPPER JUNCTION ATTACHING LATERAL PANEL TO THE FWD WINDSHIELD. CORRECTIVE ACTION: MONITOR CRACK, PER ERA 588561-14AD AND 5311-01236-02.

More about the Airbus A320-212