What was found
CORROSION FLOOR STRUCTURE WEB LOCATED BETWEEN FR 33 TO FR 34 AT LEVEL OF STR 38LT IN FWD CARGO COMPARTMENT. CORRECTIVE ACTION: REPLACED FLOOR STRUCTURE, PER SRM A320 51-72-11.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION FLOOR STRUCTURE WEB LOCATED BETWEEN FR 33 TO FR 34 AT LEVEL OF STR 38LT IN FWD CARGO COMPARTMENT. CORRECTIVE ACTION: REPLACED FLOOR STRUCTURE, PER SRM A320 51-72-11.