What was found
SHIP 3159 DURING TEST FOUND PSU AT 10DEF WOULD NOT OPEN. CORRECTIVE ACTION: R/R PSU PER A319 AMM 25-25. OPS CHECKS GOOD. (7555940)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHIP 3159 DURING TEST FOUND PSU AT 10DEF WOULD NOT OPEN. CORRECTIVE ACTION: R/R PSU PER A319 AMM 25-25. OPS CHECKS GOOD. (7555940)