What was found
SHIP 3123 - ROWS 3 CD AND 29 ABC WOULD NOT DEPLOY DURING PSU DROP TEST. CORRECTIVE ACTION: REMOVED AND REPLACED PSU AT ROW 3CD AND 29ABC IAW A319 AMM 25-25. OPS CK GOOD. (7384974)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHIP 3123 - ROWS 3 CD AND 29 ABC WOULD NOT DEPLOY DURING PSU DROP TEST. CORRECTIVE ACTION: REMOVED AND REPLACED PSU AT ROW 3CD AND 29ABC IAW A319 AMM 25-25. OPS CK GOOD. (7384974)