As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DTE - REPAIR APPROVAL IS LIMITED TO 6 MONTHS SERVICE FROM DATE OF APPROVAL ONLY (BY 20JUN2022). ADDITIONAL ENGINEERING AUTHORIZATION (ER/A REVISION) IS REQUIRED FOR CONTINUED SERVICE BEYOND THIS LIMIT. NOTE TO ENGINEER: DAMAGE TOLERANCE EVALUATION IS REQUIRED IN ACCORDANCE WITH PROCEDURES ESTABLISHED IN FAA AC 120-93. ASSOCIATED ER/A 00-595840 ADDED FOR AC 3022. (LP# 2061415)