What was found
SHIP 175 FOUND A CRACK AT THE 3RD FASTENER FROM THE TOP OF THE INSPECTION AREA ON THE BS1725 BULKHEAD OUTER CHORD STRAP AT STR-7R, CORRECTIVE ACTION: DAMAGE AREA REPAIRED AS PER B767-300 SRM53-80-01 -2R REPAIR 5 (2117874)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHIP 175 FOUND A CRACK AT THE 3RD FASTENER FROM THE TOP OF THE INSPECTION AREA ON THE BS1725 BULKHEAD OUTER CHORD STRAP AT STR-7R, CORRECTIVE ACTION: DAMAGE AREA REPAIRED AS PER B767-300 SRM53-80-01 -2R REPAIR 5 (2117874)