What was found
***DTE*** A321 / FUSELAGE / FR 58 - 61 / STR 42R, 43R, & 42L / DEFORMED. REPAIR APPROVAL IS LIMITED TO 6 MONTHS FROM REPAIR ACCOMPLISHMENT. REPAIR APPROVAL IS LIMITED TO 6 MONTHS AFTER SECTION I (FEB. 9, 2022). ADDITIONAL ENGINEERING AUTHORIZATION (ER/A) REVISION IS REQUIRED FOR CONTINUED SERVICE BEYOND THIS LIMIT. NOTE TO ENGINEERING: DAMAGE TOLERANCE ANALYSIS IS REQUIRED IN ACCORDANCE WITH PROCEDURES ESTABLISHED BY FAA ADVISORY CIRCULAR 120-93. AIRBUS MUST BE CONTACTED FOR NEW RDAF REVISION. ASSOCIATED ER/A 00-596416 ADDED FOR AC 1028. (LP# 2115974)