What was found
SHIP 3308 DONT PAST TEST EMERGENCY POWER SUPPLY UNIT (18WL). CORRECTIVE ACTION: REPLACED EMERGENCY POWER SUPPLY UNIT (18WL), PERFORMED OPERATIONAL CHECK OF THE POWER SUPPLY UNIT BITE CHECK, PERFORMED BONDING CHECK, AND PERFORMED OPERATIONAL CHECK OF THE EMERGENCY LIGHT VIA THE EPSU TEST PUSH BUTTON, AND REPLACED SLIDE RAFT AFT DOOR 4 RH DUE TO TSM. ALL OPERATIONAL TEST ARE GOOD. (2616400)