What was found
SHIP 3422 WILL PERFORM ALL ELECTRICAL AND STRUCTURAL MODIFICATIONS FOR THE VIASAT INSTALLATION. PARTIAL SOFTWARE WILL BE UPLOADED AS WELL. CORRECTIVE ACTION: VIASAT INSTALLATION COMPLETED PER ER/A 608511-14. (2763500)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHIP 3422 WILL PERFORM ALL ELECTRICAL AND STRUCTURAL MODIFICATIONS FOR THE VIASAT INSTALLATION. PARTIAL SOFTWARE WILL BE UPLOADED AS WELL. CORRECTIVE ACTION: VIASAT INSTALLATION COMPLETED PER ER/A 608511-14. (2763500)